Sanding is fun. Ready for a second coat of epoxy primer. After that I’m going to bond the canopy to the frame.
I know you aren’t supposed to sand back down to the fiberglass but several sections never got the weave filled in. Ready for coat #2.
This oil suction port is leaking. I can’t fix the leak until I get some copper crush gaskets of the right size which is AN900-16.
This is the new oil quick drain. Unfortunately I see no way of safety wiring it.