Sep 132015
 

Drilled the holes for switches on the right hand side of the panel.   From top to bottom we have the Starter, zebus Alt Feed, Aux Alternator, Left Pmag, Right Pmag, Battery Master, and finally IBBS brownout battery

image

 Posted by at 6:04 PM