Oct 042015
 

First thing I did this morning was read all this over and over.

image

Left side switches wired except the Pitot Heat.  E-bus wires run as well.

image

Left side switches.  Still a few to go and I need to order different switches for the PMags.

image

Second firewall passthrough with some of the wires; battery contactor, main buss and battery bus.  I’ll place an adel clamp on the upper engine mount strut later.  All of this is just temporary as everything on the firewall will have to come off in order to install the insulation and stainless firewall.

image

The current state of the panel.

image

 Posted by at 3:49 PM