{"id":693,"date":"2015-06-20T16:30:22","date_gmt":"2015-06-21T00:30:22","guid":{"rendered":"http:\/\/tondu.com\/rv8a\/?p=693"},"modified":"2015-06-20T16:31:37","modified_gmt":"2015-06-21T00:31:37","slug":"wiring-and-brake-lines","status":"publish","type":"post","link":"http:\/\/tondu.com\/rv8a\/?p=693","title":{"rendered":"Wiring and Brake Lines"},"content":{"rendered":"<p>We started placing components on the avionics shelf and ran some wires left and right through the fuselage. \u00a0This is a process and will likely take a month to complete. \u00a0Here are s few shots of in process. \u00a0You can also see the brake lines which are now completed. \u00a0I had ordered flexible lines from TSFlightlines but decided against using them as they would require more adel clamps than I wanted to put in.<\/p>\n<p><a href=\"http:\/\/tondu.com\/rv8a\/wp-content\/uploads\/2015\/06\/image36.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-687\" src=\"http:\/\/tondu.com\/rv8a\/wp-content\/uploads\/2015\/06\/image36-700x525.jpg\" alt=\"image\" width=\"700\" height=\"525\" srcset=\"http:\/\/tondu.com\/rv8a\/wp-content\/uploads\/2015\/06\/image36-700x525.jpg 700w, http:\/\/tondu.com\/rv8a\/wp-content\/uploads\/2015\/06\/image36-150x113.jpg 150w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/a><\/p>\n<p>The GEA 24\u00a0is located in the center and IBBS brownout battery behind it. \u00a0The GAD 29 is on the left. \u00a0These are screwed in with nutplates. \u00a0Mounting screws are easily accessible through the Showplanes forward canopy.<\/p>\n<p><a href=\"http:\/\/tondu.com\/rv8a\/wp-content\/uploads\/2015\/06\/image37.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-688\" src=\"http:\/\/tondu.com\/rv8a\/wp-content\/uploads\/2015\/06\/image37-700x525.jpg\" alt=\"image\" width=\"700\" height=\"525\" srcset=\"http:\/\/tondu.com\/rv8a\/wp-content\/uploads\/2015\/06\/image37-700x525.jpg 700w, http:\/\/tondu.com\/rv8a\/wp-content\/uploads\/2015\/06\/image37-150x113.jpg 150w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>We started placing components on the avionics shelf and ran some wires left and right through the fuselage. \u00a0This is a process and will likely take a month to complete. \u00a0Here are s few shots of in process. \u00a0You can also see the brake lines which are now completed. \u00a0I had ordered flexible lines from <a href='http:\/\/tondu.com\/rv8a\/?p=693' class='excerpt-more'>[&#8230;]<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[17,20,8,10],"tags":[],"jetpack_featured_media_url":"","_links":{"self":[{"href":"http:\/\/tondu.com\/rv8a\/index.php?rest_route=\/wp\/v2\/posts\/693"}],"collection":[{"href":"http:\/\/tondu.com\/rv8a\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/tondu.com\/rv8a\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/tondu.com\/rv8a\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/tondu.com\/rv8a\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=693"}],"version-history":[{"count":2,"href":"http:\/\/tondu.com\/rv8a\/index.php?rest_route=\/wp\/v2\/posts\/693\/revisions"}],"predecessor-version":[{"id":695,"href":"http:\/\/tondu.com\/rv8a\/index.php?rest_route=\/wp\/v2\/posts\/693\/revisions\/695"}],"wp:attachment":[{"href":"http:\/\/tondu.com\/rv8a\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=693"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/tondu.com\/rv8a\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=693"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/tondu.com\/rv8a\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=693"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}